Zimbabwe exceeds 2025 gold production target, as deliveries top 46 tonnes

Zimbabwe has surpassed its gold production targets for 2025, with deliveries to Fidelity Gold Refinery (FGR) reaching 46,7 tonnes.

The record-breaking performance was driven by a surge in small-scale mining activity, which accounted for 75 percent of the total gold output.

As at December 31, 2025, the country surpassed the Government’s 40-tonne target, ending the year with a powerful “December rush” of nearly five tonnes.

Throughout the year, the artisanal and small-scale miners outperformed large scale mines by a wide margin after delivering 34,9 tonnes.

Large-scale mines delivered 11,8 tonnes.-herald

Leave a Reply

Your email address will not be published. Required fields are marked *